Verification of the bridge installed plates and bolts compared to as-built drawings
3D scanning and modeling of the basement of a hospital building for the implementation of a new waiting room.
As-built drawings of existing structures for validation of conformity.
3D scanning and modeling of a warehouse structure for validation of conformity.
3D scan and modeling for the addition of a new chute and relocation of existing equipments
Validation of existing 3D model position with existing installations.
3D scanning and modeling of a building boiler room for an electromechanical construction company.
3D scanning and modeling of the walls of a hospital building for an architect.
As-built drawings (3D scanning and modeling) of a bridge for a company specializing in concrete.
Using the 3D scan, assessment of the floor of an operating suite for a general contractor.
As-built drawings (3D scanning and modeling) of the piping and components of a tank farm.
Survey and as-built drawings of an electrical room and electrical equipments.
Perform a 3D scan of a cemetery to verify the survey of the surveyor and assist in the creation of a database of lot possessors.
As-built drawings of piping and existing equipment in order to install a new pump-motor unit.
As-built drawing (3D scanning and modeling) for a plant in the petrochemical industry.